Campaign Timeline
Generated from
greywater-reach-01-initial-v1at 2026-08-06T19:54:38-04:00. Schema 0.1.0; source greywater-reach-post-campaign-archived-v1; CANONICAL.
Late summer, Year 1 — Turn 006
- SC-GWR-OPEN-P1-ELIGIBLE: false → true (GWR-D10)
- SC-GWR-OPEN-P1-EXPECTED: false → true (GWR-D10)
- SC-GWR-OPEN-P2-ELIGIBLE: false → true (GWR-D10)
- SC-GWR-OPEN-P2-EXPECTED: false → true (GWR-D10)
- SC-GWR-OPEN-P3-ELIGIBLE: false → true (GWR-D10)
- SC-GWR-OPEN-P3-EXPECTED: false → true (GWR-D10)
- SC-GWR-OPEN-P4-ELIGIBLE: false → true (GWR-D10)
- SC-GWR-OPEN-P4-EXPECTED: false → true (GWR-D10)
- T001-SC-G01: No player-to-player contact → No player-to-player contact or private propagation (T001-D01, T001-D02, T001-D03, T001-D04)
- T001-SC-G02: Seeded AI contact opportunities → Northbarrow and Ferryend offers active; Juniper Fold and Rushhook untriggered (T001-D01, T001-D03)
- T001-SC-G03: Shared Whiteback cycle hidden → One Merehaven inlet restrained; no regional inference (T001-D04)
- T001-SC-G04: — → One-turn observation only; no mechanical or victory effect (T001-D01, T001-D02, T001-D03, T001-D04)
- T001-SC-G05: Four active leaders at zero misses → Four active leaders remain at zero misses (T001-D01, T001-D02, T001-D03, T001-D04)
- T001-SC-P1-01: Moving western abutment; passage needed → Controlled light passage; cattle closure continues (T001-D01)
- T001-SC-P1-02: Earlier removal hidden except to Dorr; Evin suspects → Worked gaps observable; authorization unresolved (T001-D01)
- T001-SC-P1-03: Demand timetable → Conditional cooperation; alternate route prepared (T001-D01)
- T001-SC-P1-04: No direct contact → Conditional labor-for-witnessed-access offer (T001-D01)
- T001-SC-P1-05: — → Witnessed crossing ledger demonstrated (T001-D01)
- T001-SC-P2-01: Warm mold-scented seed; extent unknown → Uneven loss established; usable reserve protected (T001-D02)
- T001-SC-P2-02: Roof seam leaked; lower airflow weak → Seed-house seam and airflow repaired (T001-D02)
- T001-SC-P2-03: Lio missing → Lio recovered alive; broken ankle limits Y01-M02 hunting (T001-D02)
- T001-SC-P2-04: Wet plots and six damp homes → Narrow spring-safe improvements completed (T001-D02)
- T001-SC-P2-05: Unauthorized marks hidden → Fresh marks discovered; authorship disputed (T001-D02)
- T001-SC-P2-06: Woodland strategy rivalry → Boundary hearing is next plausible action (T001-D02)
- T001-SC-P3-01: Planting and drainage urgent → Most planting complete; wettest section delayed (T001-D03)
- T001-SC-P3-02: Collapse cause unresolved → Safe salvage and witnessed runoff/vent evidence; no verdict (T001-D03)
- T001-SC-P3-03: Two injured workers → One seated-work limit; one non-weight-bearing through Y01-M02 (T001-D03)
- T001-SC-P3-04: Upstream clay reported → Promising hand sample remains unproven (T001-D03)
- T001-SC-P3-05: Existence known; no current terms → Preliminary witnessed service terms; no agreement (T001-D03)
- T001-SC-P3-06: Resentful wary tension → Witnessed causal disagreement; verdict deferred (T001-D03)
- T001-SC-P4-01: Racks, boats, and cordage damaged → Two racks and one boat usable; fuel/cordage remain limiting (T001-D04)
- T001-SC-P4-02: Run approaching; limited capacity → Modest preserved catch added under witness (T001-D04)
- T001-SC-P4-03: Cut stakes and fiber observed → Local dense-net harm strongly supported; authorship unresolved (T001-D04)
- T001-SC-P4-04: — → Temporary five-day coordination cycle demonstrated (T001-D04)
- T001-SC-P4-05: Catch argument → Conditional compliance; scope dispute continues (T001-D04)
- T001-SC-P4-06: Seeks recognized travel role → Recognized local survey role; no outside voyage (T001-D04)
- T002-SC-O01: Turn 001 closed; Turn 002 not opened → Turn 002 open for all four active players (GWR-D11)
- T002-SC-O02: Y01-M01 — Early spring, Year 1 → Y01-M02 — Mid-spring, Year 1 (GWR-D11)
- T002-SC-G01: No direct player contact → Still none; two names and one unnamed rumor propagate only through AI carriers (T002-D01, T002-D02, T002-D03, T002-D04)
- T002-SC-G02: Northbarrow and Ferryend offers active; Juniper Fold and Rushhook untriggered → Four bounded AI contacts or agreements occur (T002-D01, T002-D02, T002-D03, T002-D04)
- T002-SC-G03: Full cycle hidden; one inlet restrained → Merehaven gains tentative outlet timing plus stronger local comparison; full cycle remains hidden (T002-D04)
- T002-SC-G04: One-turn observation → Two-turn hypothesis across all four; no mechanical, rule, or victory effect (T002-D01, T002-D02, T002-D03, T002-D04)
- T002-SC-G05: Four active leaders at zero misses → Four active leaders remain at zero misses (T002-D01, T002-D02, T002-D03, T002-D04)
- T002-SC-P1-01: Controlled light passage; cattle barred; fodder short → Limited prepared upland stock route carries small groups; western core remains cattle-closed (T002-D01)
- T002-SC-P1-02: Dorr's authorization GM-only → Witnessed winter testimony establishes Dorr's emergency authorization and mixed causal responsibility (T002-D01)
- T002-SC-P1-03: Guarded technical defense → Keeps rebuild authority while owing witnessed stone-or-labor restitution (T002-D01)
- T002-SC-P1-04: Proposed labor-for-access offer → Superseded by witnessed seasonal labor-and-certified-passage compact (T002-D01)
- T002-SC-P1-05: One inspection-and-input cycle → Extends to stone authorization, restitution, external labor, and certification (T002-D01)
- T002-SC-P1-06: No player-community knowledge → Tentative unnamed rumor of a large downstream pottery settlement via Oren (T002-D01)
- T002-SC-P2-01: Reduced planting margin; mixed lot uncertain → Most sound seed planted; smaller reserve retained; comparison patch weak and uneven (T002-D02)
- T002-SC-P2-02: Lio unable to hunt during Y01-M02 → Healing without setback; route knowledge shared; reduced familiar hunting continues (T002-D02)
- T002-SC-P2-03: Marking order disputed → Cutter testimony and Beren establish his proposed clearing line; no cutting occurred (T002-D02)
- T002-SC-P2-04: Defensive rivalry → Open authority dispute under temporary mixed boundary custody (T002-D02)
- T002-SC-P2-05: Potential compatibility; no meeting → Indirect Juniper contact established; witnessed path-and-tree walk requested (T002-D02)
- T002-SC-P2-06: No player-community knowledge → Ridgeford known by name and general stone-ford location through Ava (T002-D02)
- T002-SC-P3-01: Wettest low-field section delayed → Most delayed section planted; soft lower edge remains deferred (T002-D03)
- T002-SC-P3-02: Runoff and restricted-vent evidence; no order established → Witnessed account establishes Rusk's continued-firing and vent order; causation remains mixed (T002-D03)
- T002-SC-P3-03: Clay promising but unproven; one worker non-weight-bearing → Small trial partially succeeds; clay limited to further tests; care limits maintained (T002-D03)
- T002-SC-P3-04: Open technical conflict → Decision responsibility established; accountability and standing practice unresolved (T002-D03)
- T002-SC-P3-05: Proposed future compensation terms → One three-jar witnessed crossing completed; no standing right or debt (T002-D03)
- T002-SC-P3-06: No player-community knowledge → Merehaven known by name and general fishing reputation through Seln (T002-D03)
- T002-SC-P4-01: Two racks and one boat usable; fuel and cordage tight → Three racks usable; protected fuel floor; wet later reserve; second boat secured (T002-D04)
- T002-SC-P4-02: Modest catch fully preserved → Modestly higher catch fully preserved; stronger run still ahead (T002-D04)
- T002-SC-P4-03: Strong local harm evidence → Repeated comparison confirms persistent local deficit; authorship and full cycle unresolved (T002-D04)
- T002-SC-P4-04: Temporary five-day coordination cycle → Renewed for one moon with narrow common-resource mandate and representative review (T002-D04)
- T002-SC-P4-05: — → First inventory, trip-check, repair-reporting, and apprentice-observer cycle demonstrated (T002-D04)
- T002-SC-P4-06: Wary conditional stance not yet observed → Direct reciprocal-observation contact; no restriction or standing agreement (T002-D04)
- T003-SC-O01: Turn 002 closed; Turn 003 not opened → Turn 003 open for all four active players (GWR-D12)
- T003-SC-O02: Y01-M02 — Mid-spring, Year 1 → Y01-M03 — Late spring, Year 1 (GWR-D12)
- T003-SC-G01: No direct player contact; names and rumors carried by AI communities → Still no direct player contact; Claybank gains only a bounded future route toward Merehaven (T003-D01, T003-D02, T003-D03, T003-D04)
- T003-SC-G02: Four bounded AI contacts or agreements active → Northbarrow compact performs; Juniper walk completes; Ferryend channel clarifies; Rushhook comparison deepens (T003-D01, T003-D02, T003-D03, T003-D04)
- T003-SC-G03: Merehaven has tentative outlet timing and local comparison; full cycle hidden → Merehaven may tentatively infer outlet-to-inlet timing; full cycle remains hidden (T003-D04)
- T003-SC-G04: Two-turn uneffected hypothesis → Three-turn strengthened hypothesis with AI-community recognition; no rule, bonus, or victory effect (T003-D05)
- T003-SC-G05: Four active leaders at zero misses → Four active leaders remain at zero misses (T003-D01, T003-D02, T003-D03, T003-D04)
- T003-SC-P1-01: Limited prepared upland route; western core cattle-closed; restitution and compact pending execution → Route maintained with brief wear closure and clearer load; staging advances; core remains cattle-closed (T003-D01)
- T003-SC-P1-02: Accountable technical authority owing witnessed restitution → Specific stone-and-skilled-labor contribution recorded while technical direction continues (T003-D01)
- T003-SC-P1-03: Records inputs, restitution, external labor, inspection, and certification → Third cycle adds route wear and load, Northbarrow performance, readiness, and exact restitution credit (T003-D01)
- T003-SC-P1-04: Recognized young route runner → Demonstrates bounded watch, message, and alarm coordination subject to renewal (T003-D01)
- T003-SC-P1-05: Bounded cooperation awaiting certification work → Named labor performs; certification expectation sharpens without passage or ownership (T003-D01)
- T003-SC-P2-01: Sound planting established; reserve retained; mixed patch weak; boundary walk pending → Sound lots mostly hold; low edge declines; reserve intact; mixed patch distinctly weak (T003-D02)
- T003-SC-P2-02: Cautiously compatible indirect contact and requested walk → Direct witnessed cooperation establishes agreed features and one unresolved strip (T003-D02)
- T003-SC-P2-03: Open authority dispute under temporary custody → Evidence-governed active rivalry under continued mixed no-cut custody (T003-D02)
- T003-SC-P2-04: No surveyed candidate outside the disputed line → One unsuitable site and one costly plausible dry site documented; no clearing authority (T003-D02)
- T003-SC-P2-05: Healing with transferred route knowledge; reduced familiar hunting → Further improvement and stronger knowledge transfer; no ordinary hunting this month (T003-D02)
- T003-SC-P3-01: Temporary trial safety; accountability and standing practice unresolved → Standing shared-firing compact adopted; first review trial complete; old quarter closed (T003-D03)
- T003-SC-P3-02: Temporary rules for the next bounded trial → Standing compact with named tender, worker stop, site gate, records, and public revision (T003-D03)
- T003-SC-P3-03: Accountability conflict under established responsibility → Governed technical rivalry under the compact and competing site reports (T003-D03)
- T003-SC-P3-04: Small trial partly succeeds; clay limited to further tests; no future site → Second batch mostly sound with defects; dry terrace and drainage-risked alternative documented (T003-D03)
- T003-SC-P3-05: Successful bounded exchange; no standing right or debt → Channel clarifies arrival practice and bounded lakeward route without new obligation (T003-D03)
- T003-SC-P4-01: Three racks and two boats usable; wet reserve; stronger run approaching; inlet unresolved → Fuel partly dries; bounded catch preserved with visible stop; local deficit persists (T003-D04)
- T003-SC-P4-02: Renewed for one moon under narrow mandate → Third reviewed cycle adds representative choice and burden statements; remains narrow and expiring (T003-D04)
- T003-SC-P4-03: First inventory, check, and apprentice cycle → Repeatable multi-crew teaching and reserve-boat repair list; no production boatbuilding (T003-D04)
- T003-SC-P4-04: Contained active council rivalry → Evidence-governed active allocation conflict with bounded rise and visible stop (T003-D04)
- T003-SC-P4-05: Wary reciprocal observation; no standing agreement → Timing comparison deepens; another proposal awaits Merehaven review (T003-D04)
- T004-SC-O01: Turn 003 closed; Turn 004 not opened → Turn 004 open for all four active players (GWR-D13)
- T004-SC-O02: Y01-M03 — Late spring, Year 1 → Y01-M04 — Early summer, Year 1 (GWR-D13)
- T004-SC-G01: No direct player contact; bounded future corridors exist → Still no direct player contact; Claybank expressly declines the lakeward journey (T004-D01, T004-D02, T004-D03, T004-D04)
- T004-SC-G02: Four bounded AI-community relationships active → Northbarrow work deepens; Juniper interim conduct forms; Ferryend exact service continues; Rushhook matched observation deepens (T004-D01, T004-D02, T004-D03, T004-D04)
- T004-SC-G03: Player4 has tentative outlet-to-inlet timing; full cycle hidden → Matched observations strengthen the bounded sequence; full cycle remains hidden (T004-D04)
- T004-SC-G04: Uneffected three-turn hypothesis → Turn 4 adds support; remains HYPOTHESIS with no effect pending scheduled Turn 5 review (T004-D01, T004-D02, T004-D03, T004-D04)
- T004-SC-G05: Four active leaders at zero misses → Four active leaders remain at zero misses (T004-D01, T004-D02, T004-D03, T004-D04)
- T004-SC-P1-01: Seasonal stock route measured; staged crossing work; western core cattle-closed → One bounded structural section completed and light-tested; settling and cattle certification remain; seasonal route continues within clearer limits (T004-D01)
- T004-SC-P1-02: Accountable authority with named restitution in progress → Restitution contribution completed and separately credited; technical direction continues under Evin's safety jurisdiction (T004-D01)
- T004-SC-P1-03: Third cycle records route, external labor, readiness, and restitution → Adds bounded structural work, pauses, light tests, completed restitution, and future inspection conditions (T004-D01)
- T004-SC-P1-04: One-month trial awaiting review → Renewed for one month as repeatable warning, message, assembly, and hosted-arrival routine with no coercive or military authority (T004-D01)
- T004-SC-P1-05: Performed labor with sharpened expectations; future request not exercisable → Additional named labor credited; progress explained; certification timetable expected; compact terms and future request unchanged (T004-D01)
- T004-SC-P2-01: Sound crop mostly holds; reserve intact; weak mixed patch and low edge → Mature early produce stored by source; later crop remains growing; reserve intact; most weak-patch labor retired (T004-D02)
- T004-SC-P2-02: Costly dry site documented without authority → Households authorize only a removable, labor-capped coppice and access trial outside disputed and protected ground (T004-D02)
- T004-SC-P2-03: Evidence-governed rivalry under no-cut custody → Rivalry continues through a bounded trial with Beren's approach role and Ilya's exclusions and maintenance limits (T004-D02)
- T004-SC-P2-04: Direct cooperation with unresolved permanent terms → Both communities recognize interim no-cut and named-path conduct; title, boundary, and permanent access remain unresolved (T004-D02)
- T004-SC-P2-05: Improving route teacher outside ordinary hunting → Light work and route teaching continue; no automatic heavy-hunting restoration (T004-D02)
- T004-SC-P3-01: First review trial complete; imperfect clay; two sites known → Second safe review trial completes; controlled small batches become repeatable; dry terrace preferred and lightly prepared; no production or construction (T004-D03)
- T004-SC-P3-02: Skilled lead under two-trial restriction → Ordinary preparation, teaching, and craft direction restored; named tender retains vent control and worker stops remain unconditional (T004-D03)
- T004-SC-P3-03: Standing compact with Rusk review condition → Ordinary shared-firing governance after successful review; firm site, tender vent control, worker stop, records, and public revision remain (T004-D03)
- T004-SC-P3-04: Promising dry-terrace site; no claim or construction → Preferred future site with brush cleared, hand-load approach and safe drainage line marked; no foundation, cart route, pit, or extraction (T004-D03)
- T004-SC-P3-05: Bounded informational and transactional channel → One ordinary crossing updates firsthand narrows hazards without bargain, debt, standing right, or lakeward contact (T004-D03)
- T004-SC-P4-01: Larger bounded run catch; council expiring; inlet deficit; reserve boat unrepaired → One final strong interval preserved, then acceptance declines; final council mandate has sunset; inlet slightly improves but remains deficient; reserve boat partially repaired and secured (T004-D04)
- T004-SC-P4-02: Reviewed and renewed for one moon → Final mandate through active run with explicit sunset; narrow coordination and property exclusions unchanged (T004-D04)
- T004-SC-P4-03: Repeatable multi-crew teaching and repair list → Teaching deepens and first-class repair steps complete; critical material remains unavailable; no new boatbuilding capability (T004-D04)
- T004-SC-P4-04: Evidence-governed allocation conflict → Toren wins one capacity-supported higher day and accepts later reduction; conflict remains evidence-governed (T004-D04)
- T004-SC-P4-05: Pending reciprocal timing proposal → Matched information exchange strengthens observed timing sequence without alliance, access, restriction, or shared command (T004-D04)
- T005-SC-O01: Turn 004 closed; Turn 005 not opened → Turn 005 open for all four active players (GWR-D14)
- T005-SC-O02: Y01-M04 — Early summer, Year 1 → Y01-M05 — Midsummer, Year 1 (GWR-D14)
- T005-SC-G01: Turn 005 open with four locked submissions and approved adjudication → Turn 005 results approved, delivered, reconciled, and closed (T005-D01, T005-D02, T005-D03, T005-D04)
- T005-SC-G02: Midsummer pressures pending Turn 005 resolution → Local heat, harvest, water, and storm pressures resolved through the four Turn 005 outcomes (T005-D01, T005-D02, T005-D03, T005-D04)
- T005-SC-G03: No direct cross-player contact through Turn 004 → No direct cross-player contact through Turn 005 (T005-D01, T005-D02, T005-D03, T005-D04)
- T005-SC-G04: Four-turn hypothesis pending scheduled Turn 005 review → Turn 5 adds support; remains HYPOTHESIS with no victory promotion (T005-D06)
- T005-SC-G05: No active campaign rule for recognized bounded authority → Hidden campaign rule activated under T005-A02 (T005-D05)
- T005-SC-G06: Four active leaders at zero misses → Four active leaders remain at zero misses; no elimination (T005-D01, T005-D02, T005-D03, T005-D04)
- T005-SC-P1-01: Light-load use only; cattle certification unresolved → Narrow conditional certification earned with recorded safeguards (T005-D01)
- T005-SC-P1-02: Conditional request awaiting proof → Formal request recognized; timing remains to be scheduled (T005-D01)
- T005-SC-P2-01: Early stores exposed while later grain remained uncertain → Loss contained, partial harvest secured, and reserve sealed (T005-D02)
- T005-SC-P2-02: Removable dry-site trial authorized → Dry access demonstrated with a visible runoff cost to manage (T005-D02)
- T005-SC-P3-01: Small controlled batches established → One safe terrace pilot completed with a backup tender (T005-D03)
- T005-SC-P3-02: Optional final crossing remained possible → Optional crossing canceled without penalty (T005-D03)
- T005-SC-P4-01: Temporary council in its final sunset window → Temporary authority expired; ordinary full-moon gathering remains (T005-D04)
- T005-SC-P4-02: Outlet-to-inlet timing was tentative → Inlet observations and boatcare work strengthen the bounded sequence (T005-D04)
- T006-SC-G01: Active six-turn campaign with Turn 006 delivery pending → Six-turn campaign terminated after approved finale delivery; debrief remains and Turn 007 requires a new GM decision (T006-D01, T006-D02, T006-D03, T006-D04, T006-D05, T006-D06)
- T006-SC-G02: Five-turn hypothesis without cross-player contact → Turn 6 reviewed no-promotion pattern with first bounded player contact but no victory condition (T006-D05, T006-D06)
- T006-SC-G03: Four active eligible leaders at zero misses → Four living non-eliminated leaders at zero misses; no further submission expected after campaign end (T006-D01, T006-D02, T006-D03, T006-D04)
- T006-SC-G04: No direct relationship between player communities → Bounded first contact without trade, alliance, access, protection, territory, food promise, or return commitment (T006-D05)
- T006-SC-P1-01: Conditional gate certified; first Northbarrow passage unscheduled → First passage performed with stop and repair; recurring gate burdens and per-passage scheduling remain (T006-D01)
- T006-SC-P1-02: Claybank known only as a downstream pottery rumor → Claybank directly contacted with bounded names, roles, observations, and nonpromises (T006-D05)
- T006-SC-P2-01: Much grain standing; sole Hearthspeaker office active; woodland and Juniper terms unresolved → Most harvest secured with loss visible; reviewable practices and rotating conveners replace sole office; first-frost restraint recorded (T006-D02)
- T006-SC-P2-02: Hearthspeaker with exclusive coordinating office → Former Hearthspeaker alive and respected after voluntary handoff; not eliminated (T006-D02)
- T006-SC-P3-01: One safe terrace pilot with production and repeatability unresolved → Teachable small non-food terrace firing demonstrated under compact; production remains unauthorized and heavy-work injury persists (T006-D03)
- T006-SC-P3-02: No direct player-community knowledge → Ridgeford directly contacted with bounded names, roles, observations, and nonpromises (T006-D05)
- T006-SC-P4-01: Expired council, deficient inlet, bounded Rushhook exchange, and incomplete reserve boat → Public compact active; bounded inlet trial eligible; reserve hull requires repair or salvage; Rushhook admission recorded (T006-D04)
- SC-GWR-POST-CAMPAIGN-ARCHIVE: TERMINATED campaign with optional post-campaign work pending → ARCHIVED campaign; debrief requests delivered, operating evaluation complete, optional private responses pending (GWR-D16)