GM operating record

Turn 002 · GM only

Turn 002 — Player Analysis: player3 / Claybank

Status: GM-only recommendation; no fictional outcome approved

Submission record

  • Intake: T002-I03 — VALID
  • Archive: campaign/instances/greywater-reach-01/turns/turn-002/intake/player3/turn-002/submission.md
  • Words / bytes / SHA-256: 1,019 / 6,089 / 86678b5183fea90f411259e1df1350d414f019f4790d402d3fa758dccf4b8291
  • Miss / streak: No / 0

Neutral interpretation

The leader keeps fields, injured households, and ground safety ahead of kiln prestige. The unsafe quarter remains closed. A witnessed firing account separates testimony from conclusion and produces one temporary safety rule each for vent tending, siting/runoff, and worker stop authority. A small open firing tests the upstream clay and the temporary rules without authorizing production. A shallow runoff diversion proceeds only if Hobb can keep it away from the unstable quarter. One bounded Ferryend exchange may occur after fields and trial labor are protected.

Intentions

ID Priority Intended change Method People/resources Dependencies Contingencies
P3-I1 1 Finish only workable field ground and protect injured households Dry-interval inspection, marked deferral, witnessed distributions Alin, Hobb, Miri, Daia, field and kiln witnesses Soil condition and draft capacity Defer rather than churn; ordinary tending if still wet
P3-I2 1 Establish a fair firing sequence and temporary safety rules Private-first testimony, shared correction, separate observations/conclusions Rusk, Hobb, Daia, Miri, workers, affected households Witness willingness; closed quarter maintained No status, food, or teaching penalty from the account alone
P3-I3 2 Test upstream clay and safer firing practice at small scale Matching marked pieces, open vented fire, public fuel count, recorded result Rusk, two willing workers, Hobb, Daia, Miri Firm dry site and one released labor day One firing only; stop for ground, smoke, heat, or exhaustion
P3-I4 Supporting Redirect runoff safely Stake flow path and possibly clear a shallow diversion Hobb and small hand crew Diversion does not threaten homes, fields, or bank Marked plan only if unsafe
P3-I5 Conditional Complete one limited Ferryend exchange and learn the far-bank approach Three counted jars for one witnessed return crossing or equivalent information Venn, Miri, one punt Fields and trial staffed; safe daylight Refuse armed pressure, unfamiliar terms, weather, or no same-day return

Personal expertise and leadership attention

No new personal craft expertise is claimed. The leader protects the decision architecture: attending the firing account, approving the public fuel count, and reviewing the trial. Craft, ground, bodily safety, fields, and recordkeeping remain with distinct domain authorities.

Intrinsic difficulty before power

Intent Worst defensible result Best defensible result Missing prerequisites Unavoidable costs External uncertainty
Fields/care Low field remains unplantable; reduced margin persists A dry interval permits part or all of the marked section without soil damage Dry-enough soil Field labor and continued injury support Strong runoff and local rain
Firing account Testimony conflicts and confirms only uncertainty Workers corroborate Rusk's continued firing and vent order while preserving multi-causal interpretation Complete direct records do not exist Potter-status conflict Witness candor and Rusk's response
Trial/diversion Clay cracks or site/fuel conditions abort; only method learning results Small pieces fire with enough integrity to justify a larger later test; shallow diversion reduces new runoff No production kiln; clay body and larger firing remain unproven Scarce dry fuel and a day of skilled labor Drying weather, open-fire control, clay variability
Ferryend exchange Seln refuses three jars or safe crossing One exact exchange occurs and Claybank gains a safe far-bank description plus bounded route knowledge No standing passage right Three sound jars and travel day Runoff, Seln's leverage, same-day safety

Evidence-based scoring

Dimension Score Positive evidence Defects/disqualifiers Effect relevance
Direction 5 “Repair the ground before the kiln” governs every instruction; trial questions and non-authorizations are exact No material ambiguity Prevents pilot results from becoming a production claim
Focus 5 Fields and safe learning are the two priorities; rebuild, production, extraction, second firing, and standing trade are explicitly deferred No unbounded side project Protects field and fuel critical paths
Orchestration 5 Distinct authorities, released-hand gate, site and body vetoes, counted fuel, marked pieces, exact sequence, and reports No collision or missing critical owner Supports safe trial and trustworthy evidence
Grounding 5 Integrates wet field, runoff, vent evidence, injuries, scarce fuel, unproven clay, preliminary terms, and strong runoff No invented prerequisite or certainty Improves causal learning inside real limits
Mobilization 5 Private-first testimony, chosen witness, no automatic sanction, domain dignity, kin protection, and bounded exchange align difficult stakeholders Does not assume Rusk's agreement on blame Makes candor and continued craft participation credible
Adaptability 5 Soil gate, site rejection, multiple stop authorities, one-trial ceiling, diversion fallback, and travel refusal branches No fragile assumption remains untested Preserves learning and safety across adverse results
  • Power: 1.000
  • Band: Exceptional
  • Target / ordinary window: 0.850 / 0.750–0.950
  • Permitted effect channels: candor and sequence clarity; trial quality; safety-rule internalization; partial field completion; diversion quality; bounded negotiation result.
  • Prohibited inferences: no production capability; no durable kiln; no full clay-source proof; no sole-cause blame; no standing ferry right; no knowledge beyond Seln's supported report.

Affected actors and autonomous action

Actor/faction Interest and knowledge Supported action Containment or leverage Unfinished consequence
Alin / field households Planting and carts; wet section delayed Releases one day of hands only after dry-ground review; plants part of the section and defers the soft edge Explicit field priority and marked result Lower edge remains late
Rusk / kiln households Restore prestige; knows his firing order Directs the small trial and defends the original decision; accepts temporary vent practice after testimony corroborates the order No punishment or office loss from account alone Accountability and standing rules remain unresolved
Hobb / diggers Safe clay access; heard Rusk's order Gives direct testimony, chooses the trial site, and lays a safe shallow runoff diversion Ground veto and separate evidence record Old path and quarter stay closed
Daia / injured kin Prevent coercion and repeat injury Enforces both recovery limits and formulates worker stop authority Public rule and kin witnesses One worker remains non-weight-bearing through most or all of the month
Miri Reliable measures and public records Produces a sequence record, fuel count, test comparison, and exact Ferryend terms Independent observation/conclusion columns Gains a broader institutional role
Seln / Ferryend Preserve narrows leverage; needs vessels Accepts three jars for one witnessed same-day return crossing and offers limited far-bank guidance One-exchange ceiling and no standing promise Future compensation remains open

Quiet significant-conflict justification

Conflict Cause of restraint Observable sign Next plausible action
Rusk versus Hobb over collapse Separate testimony confirms an order without making it the sole cause or stripping craft authority Rusk accepts trial rules while disputing final causal weight Standing firing code and accountability decision
Potters versus field households Trial occurs only after Alin releases hands and uses a counted small fuel share Fields receive labor first; no rebuild begins Larger test will reopen fuel competition
Claybank versus Ferryend Three jars buy one exact service, not a permanent concession Both sides witness the bounded exchange Per-crossing or vessel agreement later

Proposed state transitions

Change ID Subject Prior Proposed Decision Visibility
T002-P3-SC01 F-CLAYBANK-T001-PLANTING Wettest section delayed Most delayed ground planted; soft lower edge remains deferred T002-D03 player3
T002-P3-SC02 F-CLAYBANK-T001-EVIDENCE Runoff and vent evidence; no blame verdict Rusk's continued-firing and vent order established; causation remains shared T002-D03 player3
T002-P3-SC03 F-CLAYBANK-T001-CARE-CLAY Upstream clay promising but unproven Small trial partially succeeds; clay eligible only for further small tests T002-D03 player3
T002-P3-SC04 REL-HOBB-RUSK Open technical conflict Established decision responsibility with unresolved accountability T002-D03 player3
T002-P3-SC05 OB-T001-FERRYEND-TERMS Proposed future terms One bounded jar-for-return-crossing exchange completed; standing terms unresolved T002-D03 player3
T002-P3-SC06 Merehaven knowledge No player-clan knowledge Merehaven known by name and fishing reputation through Seln T002-D03 player3

Propagation and player-facing envelope

  • May narrate: field completion boundary; injury limits; corroborated firing order; multi-causal limit; test-piece results; temporary safety rules; diversion; exact one-crossing exchange; Merehaven's name and general fishing reputation as Seln's report.
  • Must protect: Merehaven's condition, player action, council, inlet evidence, or resources; Seln's hidden dependency ceiling; Rushhook; full Whiteback cycle; any other player submission.

GM decisions required

  • T002-D03 outcome package.
  • No elimination, rule activation, victory activation, or direct player contact is proposed.

← Return to the campaign archive