GM operating record

Turn 004 · GM only

Turn 004 — Player Analysis: player1 / Ridgeford

Status: GM-only recommendation; no fictional outcome approved

Submission record

  • Intake: T004-I01 — VALID
  • Archive: campaign/instances/greywater-reach-01/turns/turn-004/intake/player1/turn-004/submission.md
  • Words / bytes / SHA-256: 874 / 5,674 / 3f0d840f394b56f8f758e4905c94c3a00c6a2bf0222b6bc04dafaa310749af16
  • Miss / streak: No / 0

Neutral interpretation

The leader makes a safe-water crossing phase the primary project while preserving the measured stock route and limiting the renewed watch to warning, withdrawal, and witnessed access control. Evin owns environmental certification and stop authority; Dorr directs only the planned structural phase; Mara records all inputs and obligations; Sila controls route load; Pell coordinates a reviewed roster without police authority; Orra protects shelter and other prior claims on materials.

Intentions

ID Priority Intended change Method and dependencies Contingency
P1-I1 1 Complete the next cattle-safe rebuild phase when water permits Evin certifies conditions; Dorr uses staged stone and named labor; Mara witnesses counts If unsafe, remain above ground and preserve readiness
P1-I2 1 Keep seasonal stock movement within demonstrated capacity Sila records load, spacing, closures, wear, holding, and fodder Close before loss; no widening or herd increase by assertion
P1-I3 2 Renew the watch as a fair public-safety routine Household-balanced roster, alarms, expert handoff, incident and burden review Reduce or suspend sites; no pursuit, punishment, or household search
P1-I4 Supporting Maintain only usable trial equipment Orra and Pell inspect the staffs and two shields after protected work Repair from surplus or remove from service; no arms project

Intrinsic difficulty before power

Intent Worst defensible result Best defensible result Limits and costs
Crossing phase A short safe interval permits only opening and stabilizing part of the planned section The bounded structural phase is seated and survives repeated light tests Cattle certification still requires settling and repeated tests; skilled labor and grain are consumed
Stock route Warm rain or traffic forces another closure Small groups continue with clearer load and fodder requirements Seasonal path remains capacity-limited
Watch Burden complaints outweigh its routine value Fair scheduling and useful warning/access practice become repeatable No military, punitive, or coercive capability
Equipment Loose shield is discarded and no replacement is supportable Existing items remain serviceable Shelter, rope, route, and crossing claims come first

Early summer supports falling and more stable water, but does not guarantee every workday safe. The staged material and three prior cycles make one bounded structural phase plausible; full cattle certification remains too large for the same month.

Evidence-based scoring

Dimension Score Evidence
Direction 5 Safe crossing progress, route continuity, and limited watch authority are explicit and transmissible
Focus 5 One structural priority, one continuity requirement, and one subordinate reviewed routine
Orchestration 5 Named jurisdictions, sequencing, stop calls, records, outside roster, tests, and review
Grounding 5 Uses staged stone, current closure, compact terms, restitution, route evidence, and scarce surplus
Mobilization 4 Public credit, fair household duty, complaint review, and expert authority support participation
Adaptability 5 Unsafe-water branch, route closure, compact breach stop, alarm handoff, and equipment discard
  • Power: 0.908
  • Band: Strong
  • Target / ordinary window: 0.764 / 0.664–0.864
  • Permitted effect channels: structural quality, safe completion, record precision, route durability, watch reliability, household internalization.
  • Prohibited inferences: no instant cattle-safe crossing, permanent Northbarrow right, military capability, coercive visitor power, or downstream player knowledge.

Character-agency pass

Actor Supported action Unfinished consequence
Evin Certifies a short safe-water interval and stops work once when footing changes Requires settling and repeat testing before cattle certification
Dorr Completes his named restitution contribution while leading the planned phase Wants prompt certification but cannot overrule Evin
Sila Keeps small groups moving and closes the soft bend briefly after warm rain Presses for a concrete cattle-test timetable
Mara Publishes exact grain, stone, labor, visitor, and duty records Makes any later change to compact terms conspicuous
Oren Supplies the named party and demands a plain progress explanation Passage request remains earned but not yet exercisable
Pell Runs a useful second watch month within the public limits Gains a repeatable coordinator role, not independent command
Orra Repairs one fastening from true scrap and rejects wider equipment work Material expansion remains closed

Privacy envelope

  • May narrate: local structural work and tests, route condition, Northbarrow labor and known compact, restitution, watch incidents and burdens, existing equipment condition.
  • Must protect: Northbarrow hidden strategy, Ford Meadow, Claybank identity behind rumor, other submissions, hidden regional topology.

No elimination, direct player contact, rule activation, or victory activation is proposed.

← Return to the campaign archive