GM operating record

Turn 004 · GM only

Turn 004 — Player Analysis: player3 / Claybank

Status: GM-only recommendation; no fictional outcome approved

Submission record

  • Intake: T004-I03 — VALID
  • Archive: campaign/instances/greywater-reach-01/turns/turn-004/intake/player3/turn-004/submission.md
  • Words / bytes / SHA-256: 856 / 5,123 / 41051f8263be2b30e2a28c1cddd9f68e1b5ed82aff1c259d83fde8ee8d6f3889
  • Miss / streak: No / 0

Neutral interpretation

The leader completes the second review firing under the standing compact, ties Rusk's ordinary authority to observed compliance, selects the dry terrace for bounded preparation only, and requires a realistic rebuild proposal before construction. Field, care, and safety claims remain prior. Venn may make one ordinary Ferryend crossing but no lakeward expedition, vessel offer, or recurring promise.

Intentions

ID Priority Intended change Method and dependencies Contingency
P3-I1 1 Complete the second review firing and material test One hand-carried batch, named tender, fuel count, stop rights, matching forms and seepage record No repeat firing; failure returns to investigation
P3-I2 1 Resolve Rusk's review status proportionately Restore ordinary craft authority only after compliant second trial Retain restrictions and withhold shared inputs after breach
P3-I3 2 Select and prepare the safer future site Hobb/Alin/Miri walk; brush clearing and drainage stakes only Stop for field conflict, slumping, or runoff; no construction
P3-I4 Supporting Preserve a bounded Ferryend channel At most one safe ordinary crossing after local release No lakeward party, offer, standing service, or rumor treated as fact

Intrinsic difficulty before power

Intent Worst defensible result Best defensible result Limits and costs
Second firing Defects or a stop leave the clay unproven and Rusk restricted A second safe, mostly sound bounded batch supports ordinary craft direction Cannot certify food storage, bulk extraction, production, or a kiln design
Authority review Rusk complies technically but the factions dispute restoration terms Ordinary preparation and teaching authority returns under permanent shared safety limits His hidden primary causation remains unproved publicly
Dry terrace Route or drainage costs defeat preparation Stable area, approach, and drainage line are documented and lightly cleared No kiln, foundation, production pit, or reserve commitment
Ferryend Alin withholds Venn or river conditions cancel travel One ordinary crossing updates firsthand hazard practice No current Merehaven facts or standing right

Evidence-based scoring

Dimension Score Evidence
Direction 5 Finish review, choose safe ground, and prepare a later decision without claiming industry
Focus 5 Trial and site choice dominate; Ferryend is explicitly subordinate
Orchestration 5 Field release, hand-load ceiling, named authorities, counted fuel, record design, review trigger, and site gates
Grounding 5 Uses the compact, first review trial, imperfect clay, two known sites, field priority, injuries, and Ferryend terms
Mobilization 4 Preserves Rusk's path to status while protecting workers, diggers, fields, and public witnesses
Adaptability 5 Stop rights, one-fire ceiling, success/failure branches, authority breach rule, alternative site record, and travel cancellation
  • Power: 0.908
  • Band: Strong
  • Target / ordinary window: 0.764 / 0.664–0.864
  • Permitted effect channels: trial consistency, safety internalization, authority legitimacy, site evidence quality, preparation durability, rebuild-plan realism.
  • Prohibited inferences: no food-safe certification, industry, bulk extraction, kiln construction, sole-cause verdict, current Merehaven knowledge, or standing ferry right.

Character-agency pass

Actor Supported action Unfinished consequence
Rusk Completes the second safe review firing and regains ordinary preparation, teaching, and craft direction Immediate vent authority remains permanently shared; he presses for rebuilding next
Hobb Enforces ground and runoff stops and supports the dry terrace despite haul cost Continues to oppose premature extraction
Daia Maintains unconditional safety stops and injury limits Recovery does not erase household claims
Alin Releases only a small crew after field needs and limits access work Future kiln labor remains conditional on the field calendar
Miri Produces the decisive two-trial and site comparison record Refuses production claims from imperfect evidence
Venn / Seln Complete one ordinary witnessed crossing with no new bargain Informational channel remains available but strategically bounded

Privacy envelope

  • May narrate: trial procedure and defects, Rusk's public review result, compact authority, dry-site observations and preparation, Ferryend crossing and firsthand local hazards.
  • Must protect: Rusk's hidden primary-cause fact beyond established evidence, Seln's hidden strategy, Merehaven's current condition and actions, full Whiteback cycle, other submissions.

No elimination, direct player contact, rule activation, or victory activation is proposed.

← Return to the campaign archive