GM operating record

Turn 004 · GM only

Turn 004 — Player Analysis: player4 / Merehaven

Status: GM-only recommendation; no fictional outcome approved

Submission record

  • Intake: T004-I04 — VALID
  • Archive: campaign/instances/greywater-reach-01/turns/turn-004/intake/player4/turn-004/submission.md
  • Words / bytes / SHA-256: 939 / 5,953 / 2a0e44e49d729be3ee87497f11d3a6102a99e479d3e7e353225e7abd6da01455
  • Miss / streak: No / 0

Neutral interpretation

The leader subjects the council to another representative review and recommends a final mandate only through the active run. Daily catch remains tied to demonstrated fuel, racks, labor, and stop authority. Merehaven accepts Tovan's information-only comparison, continues the local inlet comparison without accusation, and performs only first-class reserve-boat repairs that do not consume protected shelter or rescue materials.

Intentions

ID Priority Intended change Method and dependencies Contingency
P4-I1 1 Preserve tail-run value without exceeding capacity Daily public capacity checks, protected fuel floor, counted loads, immediate stops Reduce cap when run, weather, fuel, racks, or labor change
P4-I2 1 Renew or expire the council legitimately Representative choice, burden statements, narrow final mandate Return work to ordinary keepers if coordination is no longer needed
P4-I3 2 Improve shared fish-timing evidence Invited same-day observations with Cal, Neri, companions, and council witness Bring any non-information proposal home; infer no unobserved facts
P4-I4 2 Advance reserve-boat repair without raiding protected work Material triage, teaching, first-class work, Eska inspection Keep boat secured if critical cordage or timber remains unavailable

Intrinsic difficulty before power

Intent Worst defensible result Best defensible result Limits and costs
Catch and reserve Run weakens quickly or wet fuel forces a low cap A final bounded pulse is preserved without crossing the protected floor Whiteback peak is passing; fuel and labor remain finite
Council Work groups decline renewal or resist burdens One final mandate coordinates the tail of the run and sunsets by a named condition No household property authority or permanent council legitimacy
Timing/inlet evidence Weather cancels visits or observations remain noisy Multiple matched observations strengthen the outlet-to-inlet sequence and local recovery comparison Still no full cycle or culprit proof
Reserve boat First-class materials permit only cleaning, drying, shaping, and minor patch preparation Limited repair materially advances under inspection Rescue cordage and shelter timber remain unavailable; no production craft

Evidence-based scoring

Dimension Score Evidence
Direction 5 Preserve the commons through capacity, reviewed authority, bounded knowledge, and maintenance
Focus 4 The four linked workstreams are coherent but still compete for leadership and skilled attention
Orchestration 5 Daily capacity announcements, stop holders, representative review, observation fields, delegation limits, and material classes
Grounding 5 Uses the actual fuel floor, three racks, two working boats, damaged inlet, council expiry, repair list, and Rushhook proposal
Mobilization 4 Work groups, crews, keepers, owners, and burdened labor all retain voice and stop authority
Adaptability 5 Cap resets, council expiry, proposal-return rule, evidence limits, and incomplete-repair branch preserve purpose
  • Power: 0.887
  • Band: Strong
  • Target / ordinary window: 0.744 / 0.644–0.844
  • Permitted effect channels: preservation efficiency, council legitimacy, stop compliance, observation comparability, maintenance learning, repair progress.
  • Prohibited inferences: no full fish cycle, Toren culpability, lake-wide authority, alliance, unilateral fishing rule, new boatbuilding capability, or knowledge of Claybank.

Character-agency pass

Actor Supported action Unfinished consequence
Varo Resets the cap downward as the run weakens and protects the dry-fuel floor Retains authority against Toren's pressure
Toren Wins one higher-capacity day through a specific crew plan but accepts the later stop Continues to contest how much evidence should constrain senior crews
Luma / Neri Maintain water separation and repeat local comparisons Local recovery evidence remains unattributed
Eska Permits only noncompeting repair materials and inspects the work Main repair remains dependent on cordage/material choice
Cal Deepens multi-crew checks, carries reciprocal reports, and coordinates first-class repair steps Gains practical status but no patrol or production authority
Tovan Accepts the information exchange and offers matched timing observations, not a shared command Remains alert to any upstream restriction proposal

Privacy envelope

  • May narrate: local catch, fuel, stop decisions, council review and sunset, observed Rushhook reports, local inlet comparison, boatcare and actual repair progress.
  • Must protect: Toren's winter-net order, full Whiteback cycle, Tovan's hidden fears beyond negotiation, Claybank identity or actions, other submissions.

No elimination, direct player contact, rule activation, or victory activation is proposed.

← Return to the campaign archive